
Veteran's Administration Dayton, Ohio
The Master Plan for the Veterans Affairs Dayton medical campus was designed for the future growth and relocation of the current 25,000SF Imaging Department to an outpatient setting. This project is located adjacent to the existing hospital with access for inpatient use. However, with 80% of the population being Outpatient, there is a separate and identifiable entrance.
The Phase 1 MRI Addition focuses on circulation, ease of expansion and the incorporation of a future 3.0 Tesla MRI. An internal courtyard, clerestory in the MRI room and natural materials throughout, encourage a stress-free and peaceful atmosphere for both staff and patients.
The project is designed to be LEED-Silver, the first on the Dayton campus
Dayton Veteran's Administration Medical Center
Location: Dayton, Ohio
Completion: 2016
Size: 5,300 SF
Designed to LEED Silver








